Exteriors PlusIndianapolis · since 1995 (317) 204-8367 Free estimate

Home / Deck building

Deck building in Indianapolis

New decks designed around how you will actually use the yard: a spot for the grill, a table that fits, benches and planters built into the rail. Composite or wood, framed properly underneath.

New composite deck with a patio table set and built-in bench along the railing

Start with how you will use it

The best decks we build start with a few plain questions. How many people do you want to seat? Where does the grill go, and which way does the smoke blow? Do you want steps down to the yard on one side or wide stairs across the front? Is there a door the deck has to line up with? A deck sized around a real table and real traffic paths feels right for decades. One sized to a round number usually ends up a foot too narrow where it matters.

Built-ins are where a deck starts to feel finished. Benches along the rail replace chairs you would otherwise have to store. Planter boxes can be framed into a bench corner, and a wide cap on the rail gives you somewhere to set a drink.

Composite deck with a planter box framed into the end of a built-in bench
A planter box framed into the end of a bench.
Close view of a built-in composite bench wrapping a deck corner
A bench wrapping the corner of the rail, mitered to fit.

Composite or wood

DeckingWhat to expect
CompositeCosts more up front. No sanding or staining, just washing. Holds its color and does not splinter. The decks in our photos are composite.
Pressure-treated woodLower cost. Needs a stain or sealer every few years to stay ahead of weather. The inspectors' life-expectancy chart gives wood decks 10 to 30 years, and maintenance is most of that spread.
MixedTreated lumber framing under composite decking and rails is a common combination, since the framing is out of the sun and weather.

The part you never see

What makes a deck last is under the boards. Footings have to reach below the frost line, which the Indianapolis permit guide lists at 30 inches, or freeze and thaw will slowly heave the posts. Joists get spaced for the decking you choose, since composite typically calls for tighter spacing than wood. Where the deck attaches to the house, the ledger board is bolted to the rim of the house and flashed so water runs off it rather than into the wall behind it.

We lay that framing out before a single board goes down, and if your deck needs an inspection, the framing is what the inspector wants to see.

New deck frame with rows of joists on hangers attached to a house
Joists hung and ready for decking, the stage an inspector looks at.

Permits for a new deck

In Indianapolis, the permit guide exempts a deck where no part of the floor is more than 30 inches above the finished grade. Anything higher needs a permit. Greenwood is stricter: any deck, pergola or gazebo larger than three feet by three feet needs one, attached to the house or not. Johnson County and Beech Grove have their own offices. We sort out which applies before we dig the first footing.

New deck questions

Picturing a deck out back?

Send a photo of the yard and the back of the house, and we will set up a time to measure.